CityIL
Posted
-
Nov 5, 2026
Saratoga Township, IL - Proposed Garage Floor Replacement RFP
The removal and replacement of the existing concrete garage floor. Contractors shall completely remove the 45 ft± X 48 ft± poured concrete floor system. New floor shall be 6" thick (minimum) concrete with wire mesh reinforcement and include include in-floor heat system. An external concrete apron shall be included with this project and shall include same reinforcement and heating system. The project shall also include floor trench drains, waste piping, and exterior wastewater holding tank. There is an alternate included in this project which contains removal of two gas operated unit heaters, and related equipment and the installation of a new ceiling hung infrared tub heater to provide a secondary heat supply.
