The project encompasses the extension of the municipal wastewater
collection system, including the furnishing of all labor, materials,
equipment, management, administration, supervision, and services
necessary to construct, start up, and warranty a low-pressure sewer
system and conventional gravity sewer system. Key construction
elements involve installing 8" gravity sewer piping, sanitary sewer
manholes, a duplex wastewater lift station, a 6" HDPE force main, a
12" HDPE force main with flushing stations, shutoff valves, and air
release valves, 2" to 4" HDPE low-pressure sewer force mains,
directional boring under major roadways, abandonment of existing
septic systems, installation of 6" gravity service laterals, packaged
simplex and duplex grinder pump stations, electrical service connections,
a diesel engine-generator set with an automatic transfer switch, and as-
built documentation.