Closing soon

Project Industry Day - Progressive Design-Build for Terminal A, B and C Baggage Handling System Improvements - Phase 3 RFP

Description: The County of Orange, through John Wayne Airport (JWA), invites interested firms to attend a non-mandatory Pre-Solicitation Outreach Meeting and Project Site Walk for the anticipated Progressive Design-Build Terminal A, B and C Baggage Handling System Improvements - Phase 3 project. The purpose of this meeting is to provide prospective respondents with an early overview of the proposed project, anticipated scope of work, project objectives, and procurement schedule. Attendees will have an opportunity to learn about the project and participate in a guided site walk of the proposed project area. The County anticipates issuing a Request for Qualifications (RFQ) for this project in Q1 2027. Date & Time December 8, 2027 at 9:00 a.m. Location John Wayne Airport, 18601 Airport Way, Santa Ana, CA 92707. Meeting at the John Wayne Statue. RSVP Information Due to airport security and operational requirements, advance registration is required for participation in the project site walk. Attendees must comply with all applicable Airport identification, security, safety, and escort requirements. Interested firms must RSVP by emailing Ranique Beas at Rbeas@ocair.com at least 48 hours in advance of the meeting date. Anticipated Agenda Introduction and welcome Project background, objectives, and anticipated scope Overview of the Progressive Design-Build delivery method Anticipated procurement schedule General questions and discussion Guided project site walk   This meeting is intended solely for industry outreach and informational purposes and does not constitute a formal solicitation for qualifications or proposals. Participation is voluntary and is not a prerequisite for responding to the forthcoming RFQ. Attendance or non-attendance will not be considered in the evaluation of future submissions. All project information presented during this meeting is preliminary and subject to change. The forthcoming RFQ, including any subsequent addenda, will govern the formal procurement process. Interested firms are encouraged to register with and monitor the County's OpenGov Procurement Portal for future announcements and solicitation documents. Estimated Cost Current expected cost range for the GMP is $200,000,000 to $231,000,000. Tentative Project Schedule NTP: July 2027 Design & Precon Services: July 2027 - July 2028 Permit: Aug 2028 - Jan 2029 Engineering, Fabrication & Shipping: Jan 2029 – Aug 2029 Construction (Terminal A & B): Aug 2029 – Jan 2033 Construction (Terminal C): Aug 2029 – Mar 2031 Project Overview The recommended program modernizes Terminal C through targeted replacement of legacy controls, upgrades to conveyor geometry and merges, ticket counter standardization, and improvements to screening accessibility. These enhancements address key operational and maintenance challenges, improve system performance and extend the service life of critical assets while minimizing impacts to the existing facility. For Terminals A and B, the program replaces aging baggage handling equipment, upgrades conveyors to current industry standards, improves baggage flow, and incorporates automated bag drop capability. Central to the strategy is the replacement of the existing screening systems with consolidated Checked Baggage Inspection System (CBIS) located in Terminal B bag room. The new CBIS combines screening operations for both terminals into a single, flexible processing facility featuring four (4) Explosive Detection System (EDS) machines, integrated oversized baggage screening, expanded queing capacity, automated bag tracking, and improved TSA inspection workflows.   Initial Project Objectives ·  Replace Aging and Inconsistent Baggage Handling Infrastructure Modernize all inbound and outbound baggage handling systems in Terminals A, B, and C—including conveyors, controls, mechanical equipment, and associated hardware—to provide a unified, reliable, and efficient system with a useful life of 20 years. Provide consolidation of systems where possible and provide interconnections. ·  Upgrade System Technology and Controls Implement updated operating systems, virtualized geo‑redundant servers, improved cybersecurity measures, and enhanced control hardware/software to meet modern performance and safety standards. ·  Enhance TSA Screening Efficiency Relocate and reconfigure TSA CBIS and CBRA spaces to streamline baggage flow, reduce processing bottlenecks, and improve coordination between JWA and TSA. ·  Improve Maintainability and Operational Access Incorporate new maintenance access points, recondition fire and security doors, and ensure that system components meet current ergonomics and safety requirements. ·  Ensure Electrical Capacity and Infrastructure Reliability Replace motor control centers and upgrade electrical, mechanical, and structural systems to support modern BHS equipment and provide long‑term operational resilience. ·  Minimize Impacts to Airport Operations Conduct work in phased increments aligned with nightly curfew periods, coordinated with airlines, Airport Operations, TSA, and Maintenance, ensuring uninterrupted terminal operations during daytime hours.

Buyer
County of Orange

County · CA, US

Released
Nov 24, 2026
Closes
Dec 8, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts