CityCA
Posted
Sep 3, 2026
Oct 1, 2026
Hillsdale Boulevard and Alameda de las Pulgas Traffic Signal Project
Work includes 7,395 SF asphalt paving and base removal; 3,950 SF concrete removal; 2,675 SF clear and grub; 1 LS pavement marking removal (slurry seal portion only); 5 EA sign post and foundation removal; 5 EA tree and stump removal; 2 EA storm drain catch basin; 1,130 SF concrete sidewalk; 2,410 SF concrete roadway and median. See outside link.
