Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Site preparation and construction of 971 SF booster station building, reinforced concrete generator pad for 125-kW generator, dry well. Install all piping and appurtenances, mechanical, electrical, and structural components to operate two 25hp booster pumps that connect to the Citys existing drinking water system. Sitework to include graded gravel surfacing, and perimeter fence. Test and commission completed system. Install all piping, appurtenances, and structures for three 6-inch pressure reducing stations and connections to the existing City drinking water system. Sitework to include removal and replacement of typical street, curb and gutter, and sidewalk sections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Austin is soliciting qualifications for the Oltorf at Travis Heights Pressure Zone Improvements project to address low water pressure and limited fire flows along the W. Oltorf Street corridor. The solicitation is listed as RFQS 6100 CLMP389 and seeks qualified firms for related engineering/consulting services. The due date for submissions is January 20, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
The City of Austin is soliciting qualifications for the Oltorf at Travis Heights Pressure Zone Improvements project to address low water pressure and limited fire flows along the W. Oltorf Street corridor. The solicitation is listed as RFQS 6100 CLMP389 and seeks qualified firms for related engineering/consulting services. The due date for submissions is January 20, 2026 at 2:00 PM local time.
AvailableLow pressure steam (lps) system improvements (boilers).
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Low pressure steam (lps) system improvements (boilers).
AvailableThis RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
Posted Date
Jan 6, 2026
Due Date
Jan 21, 2026
Release: Jan 6, 2026
Close: Jan 21, 2026
This RFP is for the removal and replacement of the existing 8" diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant.
AvailableThe City of Morro Bay is soliciting proposals for professional design and engineering services for the Elena-Blanca Pressure Zone Consolidation project, including design and engineering services during construction. The project will consolidate pressure zones (Blanca, Elena and related zones) to improve water system efficiency and reduce booster station needs. Proposers are asked to submit qualifications and proposals per the City’s RFP instructions available on the City bidding portal.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
The City of Morro Bay is soliciting proposals for professional design and engineering services for the Elena-Blanca Pressure Zone Consolidation project, including design and engineering services during construction. The project will consolidate pressure zones (Blanca, Elena and related zones) to improve water system efficiency and reduce booster station needs. Proposers are asked to submit qualifications and proposals per the City’s RFP instructions available on the City bidding portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis