Summary
Potable water distribution system improvements - contract C pumping, storage & water mains. General construction of water distribution
facilities throughout the distribution system including sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical, and instrumentation and control. The project generally includes a new 22.5 MGD water pump station, upgrades to an existing 4.5 MGD booster station, two new 5MG ground storage tanks, a new 36" water main, water main improvements, and rehabilitation of an existing 0.4MG elevated storage tank. See attached file.