Summary
Work consist of 15,000 cy of main trench excavation in earth, 15,000 lf of saw cut, 250 cy of hardpan excavation, 50 cy of rock excavation, 300 cy of test hole excavation, 3,000 cy of paving removal - - asphalt, concrete, brick, or cobblestone, 1,000 lf of 2" pe water pipe, installed, 1,000 lf of 4" pe water pipe installed, 200 lf of 6" pe water pipe, installed, 200 lf of 8" pe water pipe installed, 4,000 lf of 3" or 4" ductile iron water pipe installed, 20,000 lf of 6" ductile iron water pipe installed, 10,000 lf of 8" ductile iron water pipe installed, 5,000 lf of 12" ductile iron water pipe installed. See attached file.