Summary
Work includes replacement of leaking CIP waterlines with new C900 PVC water mains; upgrade water meters, meter reading, and water billing to AMR based system. Bid includes Base Bid plus Bid Alternates (adders). Alternates may or may not be selected for Award, solely at Owner's discretion. Base Bid includes (approx. quantities): Replacement or upgrade with AMR registers of approximately 500 various size water meters, repair/replacement of meter pits including setters and associated work; new AMR radio read system; 11,400 LF of 2" (HDPE SDR 11), 4, 6, 8" (DR-18 C-900 PVC) watermain (to be constructed with HDD methods in combination with open trenching); two bore & jack (12" & 16" steel cased) railroad crossings; 38 gate valves (all sizes), 20 flush and fire hydrants; 3,800 LF 1" 1-1/2", 2" HDPE service line with tracer wire and test stations; mobilization, connections, surfacing removal/replacement/restoration, abandonments and all other appurtenant work for a complete and operating as intended system. Owner selected Bid Alternates could add an additional 226 LF of HDD cased bore and add significantly to total quantities.