Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater treatment plant. Work includes the construction of the new Post Road Wastewater Treatment Plant which generally includes a preliminary treatment unit complete with fine screens and grit removal equipment, flow distribution box, 4 cell sequencing batch reactor system, tertiary filters, chlorine contact chamber, Parshall Flume, post aeration basin, sludge holding and dewatering facilities, Control and Maintenance buildings, piping, SCADA system, instrumentation and controls, generators, painting, electrical work, site road, fencing grading and drainage, site work and other appurtenant and related items of construction. Also included is the demolition of the existing Post Road and Manola Wastewater Treatment Plants after the new plant has been in operation at least 30 days of continuous operation. Construction and start-up of the new plant shall be completed within 500 calendar days from the Notice to Proceed. Remaining work on the site, buildings and demolition of the existing facilities shall be completed within 600 calendar days from the Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removing and replacing 3 flat roofs at the wastewater treatment plant.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Removing and replacing 3 flat roofs at the wastewater treatment plant.
AvailableWork includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableContract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis