Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Replace thirteen (13) valve actuators at the City's Wastewater Treatment Plant. The actuators will be installed for valves that serve both the sequencing batch reactors (SRBs) and Aerobic Digester B.
AvailableWastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
AvailableProject consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Project consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
AvailableRelease: Dec 23, 2025
Close: Jan 22, 2026
Chemicals for wastewater treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis