Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Prestonwood Forest Utility District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Engineer
President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Prestonwood Forest Utility District
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
Posted Date
-
Due Date
Feb 5, 2026
Prestonwood Forest Utility District
Close: Feb 5, 2026
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
AvailablePrestonwood Forest Utility District
Removal & Disposal of all existing pumps, valves, and piping within existing wet/dry well. Installation of new duplex submersible pumps, valves, and piping. Clean, coat, and seal walls and seams of interior of existing wet/dry well. Structural modification and conversion from wet/dry well to a complete wet well. Remove, dispose, and replace all electrical equipment. Remove existing discharge manhole and replace with a new corrosion resistant force main discharge manhole. Provide by-pass pumping
Posted Date
Jan 10, 2025
Due Date
Jan 30, 2025
Release: Jan 10, 2025
Prestonwood Forest Utility District
Close: Jan 30, 2025
Removal & Disposal of all existing pumps, valves, and piping within existing wet/dry well. Installation of new duplex submersible pumps, valves, and piping. Clean, coat, and seal walls and seams of interior of existing wet/dry well. Structural modification and conversion from wet/dry well to a complete wet well. Remove, dispose, and replace all electrical equipment. Remove existing discharge manhole and replace with a new corrosion resistant force main discharge manhole. Provide by-pass pumping
Prestonwood Forest Utility District
Construction of reinforced concrete access driveway including drainage inlets, piping, and installation of storm sewer manhole to tie into existing storm sewer system.
Posted Date
Sep 12, 2024
Due Date
Oct 3, 2024
Release: Sep 12, 2024
Prestonwood Forest Utility District
Close: Oct 3, 2024
Construction of reinforced concrete access driveway including drainage inlets, piping, and installation of storm sewer manhole to tie into existing storm sewer system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.