Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal & Disposal of all existing pumps, valves, and piping within existing wet/dry well. Installation of new duplex submersible pumps, valves, and piping. Clean, coat, and seal walls and seams of interior of existing wet/dry well. Structural modification and conversion from wet/dry well to a complete wet well. Remove, dispose, and replace all electrical equipment. Remove existing discharge manhole and replace with a new corrosion resistant force main discharge manhole. Provide by-pass pumping
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 2, 2025
Close: Jan 21, 2026
Road lift station improvements.
Project consists of emergency lift station improvements.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Project consists of emergency lift station improvements.
AvailableRelease: -
Close: Feb 4, 2026
Proposed lift station 4-7 improvements.
AvailableThe Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis