Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of wastewater treatment plant expansion.
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
AvailableWest Harris County Municipal Utility District No. 21 is soliciting sealed bids for the construction of a 0.39 MGD concrete bullseye wastewater treatment plant expansion in Harris County, Texas, including elevated headworks, yard piping, valves and fittings, electrical controls, and associated site work. A mandatory pre‑bid meeting will be held on January 21, 2026 at 10:00 AM at 8585 Fallbrook Drive, Houston, TX 77064. Bids are due January 28, 2026 at 10:00 AM CST, with a public opening via Zoom, and bids may be submitted electronically via CivCast.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
West Harris County Municipal Utility District No. 21 is soliciting sealed bids for the construction of a 0.39 MGD concrete bullseye wastewater treatment plant expansion in Harris County, Texas, including elevated headworks, yard piping, valves and fittings, electrical controls, and associated site work. A mandatory pre‑bid meeting will be held on January 21, 2026 at 10:00 AM at 8585 Fallbrook Drive, Houston, TX 77064. Bids are due January 28, 2026 at 10:00 AM CST, with a public opening via Zoom, and bids may be submitted electronically via CivCast.
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Posted Date
Dec 26, 2025
Due Date
Jan 29, 2026
Release: Dec 26, 2025
Close: Jan 29, 2026
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis