Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
West Harris County Municipal Utility District No. 21 is soliciting sealed bids for the construction of a 0.39 MGD concrete bullseye wastewater treatment plant expansion in Harris County, Texas, including elevated headworks, yard piping, valves and fittings, electrical controls, and associated site work. A mandatory pre‑bid meeting will be held on January 21, 2026 at 10:00 AM at 8585 Fallbrook Drive, Houston, TX 77064. Bids are due January 28, 2026 at 10:00 AM CST, with a public opening via Zoom, and bids may be submitted electronically via CivCast.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of wastewater treatment plant expansion.
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Contract 1 involves supplying, erecting and placing in operation a packaged wastewater treatment system to augment the existing Guthrie municipal wastewater treatment plant. Contract 2 involves clearing and grubbing of the new plant site. Contract 3 involves fencing the new plant site. The work is located in Guthrie, Todd County, Kentucky at or adjacent to the existing wastewater treatment plant and is to be performed in accordance with contract documents and specifications.
AvailableRelease: Dec 23, 2025
Close: Jan 22, 2026
Chemicals for wastewater treatment plant.
Examination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Examination announcement for Wastewater Treatment Plant / Water Treatment Plant Operator/Trainee positions for the City of Fulton.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →