Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater Treatment Plant - Headworks Modifications - Contract No. 01 - General/Process Mechanical; Contract No. 02 - Electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Posted Date
Dec 4, 2025
Due Date
Feb 11, 2026
Release: Dec 4, 2025
Close: Feb 11, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
The Durant City Utilities Authority is soliciting bids for the Durant Wastewater Treatment Plant Rehabilitation to rehabilitate and expand the plant including headworks, screening, and UV disinfection modifications. A mandatory pre-bid is scheduled for 2026-02-12 at 1:00 PM at Durant City Hall and bids are to be publicly opened on 2026-02-26 at 2:00 PM CST. The project is estimated at about $30M and is funded in part through the Clean Water State Revolving Fund with OWRB involvement.
Posted Date
Jan 31, 2026
Due Date
Feb 26, 2026
Release: Jan 31, 2026
Close: Feb 26, 2026
The Durant City Utilities Authority is soliciting bids for the Durant Wastewater Treatment Plant Rehabilitation to rehabilitate and expand the plant including headworks, screening, and UV disinfection modifications. A mandatory pre-bid is scheduled for 2026-02-12 at 1:00 PM at Durant City Hall and bids are to be publicly opened on 2026-02-26 at 2:00 PM CST. The project is estimated at about $30M and is funded in part through the Clean Water State Revolving Fund with OWRB involvement.
AvailableRemoving and replacing 3 flat roofs at the wastewater treatment plant.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Removing and replacing 3 flat roofs at the wastewater treatment plant.
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Mar 12, 2026
Release: Dec 5, 2025
Close: Mar 12, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →