Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1,505 LF drill 8-inch diameter borehole into target aquifer; 205 LF drill 6" diameter borehole into target aquifer; 1,390 LF furnish and install 4" nominal dia schedule 80 PVC casing (stickup incidental); 165 LF furnish and install 2" nominal diameter schedule 40 PVC casing (stickup incidental); 1,528 LF furnish and install annular seals; 182 LF furnish and install 12x20 silica sand filter pack; 115 LF furnish and install 4-inch diameter 10-slot schedule 80 PVC screen; 40 LF furnish and install 2" dia 10-slot schedule 40 PVC screen; 9 EA furnish and install aboveground surface monuments/completions with three protective bollards.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Drilling a 16" dia. potable water well to approx. 450', installation of stainless steel screen, gravel pack, grout seal, well development, test pumping, water quality sampling, video inspection and abandonment of an existing well.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Drilling a 16" dia. potable water well to approx. 450', installation of stainless steel screen, gravel pack, grout seal, well development, test pumping, water quality sampling, video inspection and abandonment of an existing well.
AvailableThis project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a new Construction of a new (replacement) groundwater well (Deep Well 6), and a monitoring well, including well drilling, casing and screen installation, well head detail, aquifer and well testing, site work (e.g., clearing and construction of a stormwater pond and outfall), and site controls necessary for stormwater control and disposal of drilling spoils and aquifer testing fluids.
Project generally includes the drilling of one (1) municipal well. This includes the drilling of a borehole, installation of casing and surface seal, performing lithologic sampling, developing the well, disinfecting and inspecting the well, and other incidental and related work.
Posted Date
Dec 11, 2025
Due Date
Jan 23, 2026
Release: Dec 11, 2025
Close: Jan 23, 2026
Project generally includes the drilling of one (1) municipal well. This includes the drilling of a borehole, installation of casing and surface seal, performing lithologic sampling, developing the well, disinfecting and inspecting the well, and other incidental and related work.
AvailableWell #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Available