Special DistrictCA
Aug 11, 2026
Closes
Sep 10, 2026
Polonio Pass Water Treatment Plant Ammonia Tank Relining Project RFP
Central Coast Water Authority is soliciting paper bids to reline an existing 6,700 gallon ammonia tank at the Polonio Pass Water Treatment Plant, using either a liquid vinyl ester or ultra-high solids epoxy lining. The work also includes removing and reinstalling the tank and its lightweight structural steel canopy, transporting the tank to an offsite coating shop, replacing damaged grout, repairing damaged exterior coatings, and conducting a 24-hour onsite soak test. The posting shows a posting date of 08/11/2026 12:00 PM (PDT), a bid deadline of 09/10/2026 3:00 PM (PDT), and the project stage is Bidding.