Summary
The Project includes the following Work: Division 1 - Improvements to the Pound Water Treatment Plant including, the replacement of 2 media filter tanks and filter media, surface wash plumbing, backwash pump, finish water pumps, filter consoles, chemical feed lines and injection points, doors, concrete steps and slab, service waterline to the water treatment plant, 2-4" flow control valves, and exterior paint on clarifier. Work also includes the installation of a new finish water pump station and building, bulk storage building and chemical totes, new chemical feed pumps, and all associated electrical services, lines, and panels. Division 2 - The construction and installation of a 500,000-gallon and a 350,000-gallon, glass-lined, bolted steel water storage tank, approx. 2,000 LF of 10" waterline, ten 10" gate valves, 1,500 LF of chain link fencing, and associated appurtenances.