Fire DepartmentNM
Aug 27, 2026
Closes
Sep 29, 2026
Genesis Center a Lab Addition & Remodel RFP
Will include the remodel to the existing building including all mechanical electrical and plumbing. Will include the 788 s. F. Addition to the existing building including all mep and structure. Provide solid core paint grade doors at all new door assemblies; sand and paint existing doors within area of construction and as indicated on door schedule. Provide birch veneer doors at all new doors in lieu of paint grade doors. Remove and replace existing doors with new veneer doors in lieu of painting existing doors. (six (6) 3'-0'x7'-0" doors total). Will include the construction of the 910 s. F. Green house building, including all mechanical, electrical, plumbing, and structura.