FederalDC
Jul 29, 2026
Closes
Sep 4, 2026
Pisgah South Culvert Rehab - (Request for Quotation)
Work Items Include: Roadway rehabilitation: Blade and shape the existing traveled way and shoulders, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in the plans and existing surface to design specifications. Scarify roadbed to remove ruts, potholes, corrugations and berms to a depth up to 6 inches or to the bottom of potholes if deeper than 6 inches. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain or re-shape ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway. Compact entire road after surfacing. Roadway surfacing: Spread and compact NCDOT ABC aggregate per the activity schedule and specifications. Clearing and grubbing: Remove fallen trees and debris within the clearing limits and mow the roadway as per details and specifications. See attached file.