Open RFP

Pisgah South Culvert Rehab - (Request for Quotation)

Description: Work Items Include: Roadway rehabilitation: Blade and shape the existing traveled way and shoulders, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in the plans and existing surface to design specifications. Scarify roadbed to remove ruts, potholes, corrugations and berms to a depth up to 6 inches or to the bottom of potholes if deeper than 6 inches. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain or re-shape ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway. Compact entire road after surfacing. Roadway surfacing: Spread and compact NCDOT ABC aggregate per the activity schedule and specifications. Clearing and grubbing: Remove fallen trees and debris within the clearing limits and mow the roadway as per details and specifications. See attached file.

Buyer
Forest Service

Federal · DC, US

Released
Jul 29, 2026
Closes
Sep 4, 2026(26 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts