Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2 EA mobilization and demobilization; 2,334 SY rework existing asphalt and base material; 596 SY import fill material for base; 130 SY base failure repair; 61 TN 8% cement slurry treatment; 734 SY asphalt emulsion, prime coat ae-p; 218 TN 1/2" type "d" dense graded hot mix asphalt; 2 EA field density testing; 28 TN 610 rock transition between pavement and driveways; 4 LF 18" rcp culvert extension at intersection including ditch transition work. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 8, 2026
Close: Jan 27, 2026
Street & Utility Reconstruction Project.
AvailableRequest for proposals for Resident Project Representation (RPR) and Construction Inspection (CI) services for the Stone Street Reconstruction Project.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
Request for proposals for Resident Project Representation (RPR) and Construction Inspection (CI) services for the Stone Street Reconstruction Project.
AvailableProcurement of new construction services for 500 Pine Street, Cambridge, MD, specifically cabinetry installation, interior doors and hardware, interior finish trims, and closet and bath accessories.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Procurement of new construction services for 500 Pine Street, Cambridge, MD, specifically cabinetry installation, interior doors and hardware, interior finish trims, and closet and bath accessories.
AvailableThe City of Saint Paul is soliciting proposals from consulting firms for design services in 2026 and possible construction engineering services in 2027 for the Earl Street Reconstruction Project, which will fully reconstruct the corridor from Minnehaha Avenue to Burns Avenue (approx. 1 mile). The selected firm will perform design and may provide construction engineering, ensuring compliance with transportation and safety standards and coordinating with city stakeholders. The estimated project value is roughly $2,000,000 to $5,000,000 and addenda (if any) are to be posted on January 28, 2026.
Posted Date
Jan 9, 2026
Due Date
Feb 11, 2026
Release: Jan 9, 2026
Close: Feb 11, 2026
The City of Saint Paul is soliciting proposals from consulting firms for design services in 2026 and possible construction engineering services in 2027 for the Earl Street Reconstruction Project, which will fully reconstruct the corridor from Minnehaha Avenue to Burns Avenue (approx. 1 mile). The selected firm will perform design and may provide construction engineering, ensuring compliance with transportation and safety standards and coordinating with city stakeholders. The estimated project value is roughly $2,000,000 to $5,000,000 and addenda (if any) are to be posted on January 28, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis