Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for proposals for Resident Project Representation (RPR) and Construction Inspection (CI) services for the Stone Street Reconstruction Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The scope of work for this project includes the replacement of the existing pavement with a new medium-duty asphalt pavement section. The work also includes the installation of new granite curbs, sidewalks, street lighting, drainage, signage, traffic signal replacements, and other incidental items. In addition, the project includes repairs to an underground vehicular tunnel, as well as repairs and partial abandonment of an existing areaway.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
The scope of work for this project includes the replacement of the existing pavement with a new medium-duty asphalt pavement section. The work also includes the installation of new granite curbs, sidewalks, street lighting, drainage, signage, traffic signal replacements, and other incidental items. In addition, the project includes repairs to an underground vehicular tunnel, as well as repairs and partial abandonment of an existing areaway.
AvailableRelease: Jan 8, 2026
Close: Jan 27, 2026
Street & Utility Reconstruction Project.
AvailableInstall 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
AvailableProvide construction services, work includes roadway reconstruction, curb & gutter, sidewalk, ADA ramps, storm drain, drainage structures, traffic control, erosion control, utilities, pedestrian hybrid beacon, permanent signing & striping, drainage pond excavation, miscellaneous construction.
Posted Date
Jan 4, 2026
Due Date
Feb 4, 2026
Release: Jan 4, 2026
Close: Feb 4, 2026
Provide construction services, work includes roadway reconstruction, curb & gutter, sidewalk, ADA ramps, storm drain, drainage structures, traffic control, erosion control, utilities, pedestrian hybrid beacon, permanent signing & striping, drainage pond excavation, miscellaneous construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis