Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 2a- Bond Improvements - New Maintenance Building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
AvailableThe solicitation (RFQ26006284) requests qualified contractors to perform repairs to the ADA tunnel entrance and retaining walls at the RIDOT Building in Providence, RI, and requires submission of a Base Bid plus required unit prices for specified work items. The initial contract period runs through June 30, 2027, with insurance, registration, and bid bond requirements specified in the solicitation. The posting was issued by the State of Rhode Island procurement on behalf of the Department of Administration / Division of Capital Asset Management and Maintenance and is available on the state's OSP/WebProcure bid board.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
The solicitation (RFQ26006284) requests qualified contractors to perform repairs to the ADA tunnel entrance and retaining walls at the RIDOT Building in Providence, RI, and requires submission of a Base Bid plus required unit prices for specified work items. The initial contract period runs through June 30, 2027, with insurance, registration, and bid bond requirements specified in the solicitation. The posting was issued by the State of Rhode Island procurement on behalf of the Department of Administration / Division of Capital Asset Management and Maintenance and is available on the state's OSP/WebProcure bid board.
AvailableSealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Sealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
AvailableWork consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →