Special DistrictNY
Posted
Aug 27, 2026
Oct 8, 2026
Westchester Train Facility Integrated Drainage and Flood Resilience Project in the Borough of The Bronx
The Work of this Contract includes long term flood mitigation and drainage improvement. The scope of the Work is summarized as follows: Install perimeter flood wall, seepage cutoff wall and security fencing. Security, access control and CCTV systems for the new perimeter walls. Provide drainage improvements to mitigate flooding. Provide pumping improvements at Circuit Breaker Houses (CBH). Construct a new pumping facility. Track, signal, traction power work to support drainage and perimeter flood protection work.
