CityNH
Posted
-
Nov 20, 2026
Lake St & Bluff St Water Main Project RFP
Work includes, but is not limited to, the installation of up to approx., 9,700 LF of 16, 12, 8, and 6-inch ductile iron main and fittings, installation of 16, 12, 8, and 6" gate valves, new hydrants, water services, installation of a temporary water system, installation of temporary flow diversion system to support open-cut installation of 70 LF of 12" HDPE water main within wetland areas around existing hitty-titty brook culvert, permanent trench paving, and surface restoration, where required; 440 LF of 6" DI pipe and fittings, per linear foot; temporary water system; 175 LF of pipe insulation. See attached file.
