Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of multi-use paths, sidewalks, curbs, gutters, curb ramps, drive approaches, paving hot mix asphalt , applying thermoplastic pavement markings, reconstructing fences, installing signs and of flashing beacons, and sump regrading.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Punta Gorda seeks qualifications from a professional engineering firm for a master agreement to perform pedestrian engineering studies citywide and deliver pedestrian crosswalk safety improvements. The scope includes evaluation of potential pedestrian safety improvements, cost analysis, permitting, design services, and grant assistance. Proposals are due January 6, 2026 at 3:00 PM ET, with the solicitation posted December 11, 2025.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
The City of Punta Gorda seeks qualifications from a professional engineering firm for a master agreement to perform pedestrian engineering studies citywide and deliver pedestrian crosswalk safety improvements. The scope includes evaluation of potential pedestrian safety improvements, cost analysis, permitting, design services, and grant assistance. Proposals are due January 6, 2026 at 3:00 PM ET, with the solicitation posted December 11, 2025.
Premium
Access the largest public sector contact database
The City of Long Beach seeks bids for the R-7252 1st Street Pedestrian Improvements project to remove existing hardscape, trees, and landscaping and install new pedestrian improvements across approximately 0.3 acres over three city blocks. The solicitation requires a mandatory pre-bid conference and site visit, includes plans/specifications and addenda, and is open with documents attached on the buyer portal.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Close: Dec 18, 2025
The City of Long Beach seeks bids for the R-7252 1st Street Pedestrian Improvements project to remove existing hardscape, trees, and landscaping and install new pedestrian improvements across approximately 0.3 acres over three city blocks. The solicitation requires a mandatory pre-bid conference and site visit, includes plans/specifications and addenda, and is open with documents attached on the buyer portal.
AvailableThe goal of this project is to remove and replace the existing shared use path along 6&24 from Donegan to Linden. The work includes removal and replacement of the existing roadway surface of the westbound lane, installation of a new path, updates to the existing bus stop, improvements to the existing stripping and driving movements, storm improvements, watermain extension, electrical and lighting upgrades.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Close: Jan 19, 2026
The goal of this project is to remove and replace the existing shared use path along 6&24 from Donegan to Linden. The work includes removal and replacement of the existing roadway surface of the westbound lane, installation of a new path, updates to the existing bus stop, improvements to the existing stripping and driving movements, storm improvements, watermain extension, electrical and lighting upgrades.
AvailableThe goal of this project is to remove and replace the existing shared use path along 6&24 from Donegan to Linden. The work includes removal and replacement of the existing roadway surface of the westbound lane, installation of a new path, updates to the existing bus stop, improvements to the existing stripping and driving movements, storm improvements, watermain extension, electrical and lighting upgrades.
Posted Date
Dec 8, 2025
Due Date
Jan 20, 2026
Release: Dec 8, 2025
Close: Jan 20, 2026
The goal of this project is to remove and replace the existing shared use path along 6&24 from Donegan to Linden. The work includes removal and replacement of the existing roadway surface of the westbound lane, installation of a new path, updates to the existing bus stop, improvements to the existing stripping and driving movements, storm improvements, watermain extension, electrical and lighting upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis