Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers, New England District is soliciting bids for paving repairs on the Bourne Bridge over the Cape Cod Canal, including replacing 2-inch bituminous pavement and compression strip seals at specified joints. The procurement is a Total Small Business set-aside under NAICS 237310 with an estimated magnitude of $1,000,000–$5,000,000 and a period of performance of 450 days. Offers are due Jan 15, 2026 at 1:00 PM EST and the opportunity is active on SAM.gov.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
Posted Date
Dec 17, 2025
Due Date
Feb 26, 2026
Release: Dec 17, 2025
Close: Feb 26, 2026
Removal and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
AvailableRelease: Dec 13, 2025
Close: Jan 22, 2026
Road and Bridge Paving Project
AvailableRepairs of Bridge 1916. The work includes eliminating deflection joints in concrete barriers, concrete repairs to bridge abutments, and installation of tie-back anchors in a wing wall.
Posted Date
Dec 29, 2025
Due Date
Jan 15, 2026
Release: Dec 29, 2025
Close: Jan 15, 2026
Repairs of Bridge 1916. The work includes eliminating deflection joints in concrete barriers, concrete repairs to bridge abutments, and installation of tie-back anchors in a wing wall.
AvailableProvide bridge replacement: grading, drainage, paving, and structure.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Provide bridge replacement: grading, drainage, paving, and structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis