Summary
Work includes 1 LS of mobilization; 1 LS of traffic control; 2,850 TN of asphalt rubber hot mix (arhm) pavement; 37 EA of adjust manhole frame and cover to grade; 80 EA of adjust water valve cover to grade; 9,000 SY of cold milling 0.1' thick of existing pavement; 2,550 SY of cold milling 0.2' thick of existing pavement; 3,825 sf of remove and replace existing pavement; 5 EA of remove and replace traffic signal loops; 46 LF of remove and replace curb and gutter; 7 EA strip "stop" pavement marker and stop bar; 3,000 LF of strip double yellow center line with button on both sides; etc, see attached file.