Pavement Rehabilitation By Slurry Seal Method At Prospect Ave., Poplar St., and Loma Linda Dr
Jul 9, 2026
Closes
Aug 18, 2026
Work consist of crack sealing, 175 extra long tn of slurry seal, 3,448 lf remove and restripe double yellow line, 6 ea remove and restripe "stop" pavement marker with stop bar, 3 ea remove and restripe "stop ahead" pavement marker, 6 ea remove and restripe "30" pavement marker, 313 lf remove and restripe 12" white crosswalk, remove and restripe "signal ahead" pavement marker, 387 lf remove and restripe 8" channelizing line, 6 ea remove and restripe directional arrow pavement marker, 1,874 lf paint red curb (2 coats of water base paint), 27 ea paint parking space marking. See attached file.
