The work within the Base Bid, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals required for construction in accordance with the Plans and these Specifications for the work herein, for the 26/27 RESIDENTIAL PAVEMENT IMPROVEMENTS, PROJECT NO. 9981 and is fully described as follows: In general, the work shall include, but is not limited to mobilization, removal and salvage or disposal of existing improvements, adjustment of existing iron to finish grade, crack sealing/filling, pavement patch and repair, type II micro surfacing, asphalt rubber chip seal, removal and installation of striping and raised pavement markings, traffic control, and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.