Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of architectural, structural, mechanical, electrical, and civil modifications to correct building code deficiencies, replace aging systems, and improve life safety, energy efficiency, and overall facility performance for the swimming pool. A building addition will house a new hrv. Additive alternates exist to address pool vessel penetrations and piping, pool filtration and treatment systems, observation balcony railing upgrades, and flooring and floor drain replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include community center pool renovations.
Posted Date
Oct 16, 2025
Due Date
Dec 17, 2025
Release: Oct 16, 2025
Close: Dec 17, 2025
Work include community center pool renovations.
AvailablePremium
Access the largest public sector contact database
City of Morgan Hill solicits bids to replaster the Centennial Recreation Center pool (≈3,418 SF) and perform associated work: remove/replace attached equipment (ladders, drain covers), replace eight Waterway 18x36 grates, replace eight pool lights (six 6" and two 4") with specified LED fixtures, and refill the pool. Requirements/qualifiers: C-53 Swimming Pool Contractor license, California DIR registration, prevailing wage compliance, 10% bid security, 100% performance and payment bonds, CARB Off‑Road compliance if applicable; estimated construction cost ~$150,000 and a tight completion window (March 2–27, 2026).
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
City of Morgan Hill solicits bids to replaster the Centennial Recreation Center pool (≈3,418 SF) and perform associated work: remove/replace attached equipment (ladders, drain covers), replace eight Waterway 18x36 grates, replace eight pool lights (six 6" and two 4") with specified LED fixtures, and refill the pool. Requirements/qualifiers: C-53 Swimming Pool Contractor license, California DIR registration, prevailing wage compliance, 10% bid security, 100% performance and payment bonds, CARB Off‑Road compliance if applicable; estimated construction cost ~$150,000 and a tight completion window (March 2–27, 2026).
AvailableThe center is 40,000 SF, featuring a 25-meter swimming pool, gymnasium, teaching kitchen, activity rooms, a fitness area, indoor and outdoor walking track, greenspace, a basketball court and playground. The renovation will help preserve the center’s ability to provide essential aquatic programming, including swim lessons, fitness classes, and therapeutic activities. Qualified contractors to improve the facility by re-plastering the pool with quartz plaster, replacing the perimeter tile around the pool deck, and repairing all delaminated areas across the pool deck surface.
Posted Date
Nov 5, 2025
Due Date
Jan 15, 2026
Release: Nov 5, 2025
Close: Jan 15, 2026
The center is 40,000 SF, featuring a 25-meter swimming pool, gymnasium, teaching kitchen, activity rooms, a fitness area, indoor and outdoor walking track, greenspace, a basketball court and playground. The renovation will help preserve the center’s ability to provide essential aquatic programming, including swim lessons, fitness classes, and therapeutic activities. Qualified contractors to improve the facility by re-plastering the pool with quartz plaster, replacing the perimeter tile around the pool deck, and repairing all delaminated areas across the pool deck surface.
AvailableRelease: Nov 19, 2025
Close: Dec 18, 2025
Pool renovations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis