Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of architectural, structural, mechanical, electrical, and civil modifications to correct building code deficiencies, replace aging systems, and improve life safety, energy efficiency, and overall facility performance for the swimming pool. A building addition will house a new hrv. Additive alternates exist to address pool vessel penetrations and piping, pool filtration and treatment systems, observation balcony railing upgrades, and flooring and floor drain replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for proposals for the Community Center Pool Area Vapor Barrier Project, involving interior SPF insulation application (closed cell polyurethane foam with white coatings) and repair work (caulking seams and penetrations) in the pool area.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Request for proposals for the Community Center Pool Area Vapor Barrier Project, involving interior SPF insulation application (closed cell polyurethane foam with white coatings) and repair work (caulking seams and penetrations) in the pool area.
AvailableThe center is 40,000 SF, featuring a 25-meter swimming pool, gymnasium, teaching kitchen, activity rooms, a fitness area, indoor and outdoor walking track, greenspace, a basketball court and playground. The renovation will help preserve the center’s ability to provide essential aquatic programming, including swim lessons, fitness classes, and therapeutic activities. Qualified contractors to improve the facility by re-plastering the pool with quartz plaster, replacing the perimeter tile around the pool deck, and repairing all delaminated areas across the pool deck surface.
Posted Date
Nov 5, 2025
Due Date
Jan 26, 2026
Release: Nov 5, 2025
Close: Jan 26, 2026
The center is 40,000 SF, featuring a 25-meter swimming pool, gymnasium, teaching kitchen, activity rooms, a fitness area, indoor and outdoor walking track, greenspace, a basketball court and playground. The renovation will help preserve the center’s ability to provide essential aquatic programming, including swim lessons, fitness classes, and therapeutic activities. Qualified contractors to improve the facility by re-plastering the pool with quartz plaster, replacing the perimeter tile around the pool deck, and repairing all delaminated areas across the pool deck surface.
Seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the Sterling Recreation Center Pool. The Project is considered a Traditional Design-Build, which will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD).
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the Sterling Recreation Center Pool. The Project is considered a Traditional Design-Build, which will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD).
The City of South Portland is seeking a qualified firm to replace the pool deck flooring at the South Portland Community Center. This involves removing existing rubber coating and tile, and applying a full broadcast flake system in both areas.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
The City of South Portland is seeking a qualified firm to replace the pool deck flooring at the South Portland Community Center. This involves removing existing rubber coating and tile, and applying a full broadcast flake system in both areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis