Egg Harbor Township School District
School DistrictNJ
Aug 8, 2026
Closes
Sep 10, 2026
Alder Avenue Middle School Partial Roof Replacement RFP
Middle school partial roof replacement.
Description: Total Roof Size includes two roof sections and a total of approx 14,000 SF. Base Bid roof will require tear-off existing ballasted EPDM roofing membrane, recovery board, underlying built up membrane, top loose wood nailer and All-Weathercrete insulation down to the original concrete deck. New insulation system shall be a minimum of 2 layers of polyisocyanurate foam boards with 1/2" gypsum overlayment board. All insulation to be adhered with spray-on urethane foam. Provide tapered insulation on roof areas as shown on roof plans.
SchoolDistrict · NC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
Egg Harbor Township School District
School DistrictNJ
Aug 8, 2026
Closes
Sep 10, 2026
Middle school partial roof replacement.
Egg Harbor Township School District
School DistrictNJ
Aug 8, 2026
Closes
Sep 10, 2026
Elementary school partial roof replacement.
School DistrictMA
Aug 5, 2026
Closes
Sep 4, 2026
Remove and dispose of existing spf & bur roofing assemblies and all associated components down to the existing structural deck at roof area h; install new 2-ply sbs modified bitumen roof assembly and all associated components.
School DistrictVA
Jul 1, 2026
Closes
Sep 23, 2026
Work includes roof replacement.
Procurement and program contacts connected to Guilford County Schools.