FederalVA
Posted
Sep 15, 2026
Sep 25, 2026
PANMCC-26-P-0000 054193 NEC - Gate Motor Replacement RFP
Gate motor replacement.
Description: The Network Enterprise Center at Fort Lee seeks a non-personal services contractor to replace gate motor assemblies and related safety components at Building 8045. The work includes installing two LiftMaster INSL 24UL slide gate motors, photo-eye and contact-edge safety devices, pedestal stands, and testing the completed system, with performance lasting 180 days from award. This is a federal synopsis solicitation with a total small-business set-aside for work at Fort Lee, Virginia, and it is not a grant program.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalVA
Posted
Sep 15, 2026
Sep 25, 2026
Gate motor replacement.
Special DistrictMA
Posted
Sep 2, 2026
Sep 24, 2026
Westfield Gas & Electric Light Department is inviting vendors to submit bids for Bid #26-18, Southwick Gate Station Boiler Replacement. COMMBUYS classifies it as boiler and furnace construction and maintenance services and identifies the purchase method as open market, confirming it is a procurement rather than a grant. The solicitation was available beginning September 2, 2026, and bids are scheduled to open on September 24, 2026, at 12:00 PM; vendors must contact Danielle Aubrey for the bid documents and updates.
Wisconsin Department of Administration
State AgencyWI
Posted
Aug 31, 2026
Oct 6, 2026
In general, the work consists of: In a tunnel to remove two electronic security sliding gates and wire mesh partitions and replace with two electronic security sliding gates with security glazing and wire mesh partitions.
State of Nevada Office of the Military
State AgencyNV
Posted
Sep 16, 2026
Sep 30, 2026
Qualified contractors to provide an exit gate replacement. Gate must meet UL325 compliant. Remove exiting gate, post electrical box and hydraulic supply lines concrete & asphalt, chain link fence. Install a new 24ft chain link double swing gate to match existing height. Set new 6" gate post, 6ga. 2" mesh chain link infilled, 2" sch-40 round galvanized frame, with heavy duty greaseable hinges. Install (3) rows of barbed wire on top of new gate. Pour new concrete pad for new operators. Installed 2-HDSW24UL gate operators with battery backup. Install in ground safety loops & exit loops, photo eye, LIFTMASTER 1300libs. Mag lock, operators bolted to new concrete pad.