CityTN
Posted
-
Oct 1, 2026
Exit 11 Gravity Sewer Replacement RFP
Work includes approx 590 LF 8" PVC gravity sewer main by trenching, backfilling, jack and bore; 575 LF 8" DI gravity sewer main abandonment.
Description: Qualified contractors to provide an exit gate replacement. Gate must meet UL325 compliant. Remove exiting gate, post electrical box and hydraulic supply lines concrete & asphalt, chain link fence. Install a new 24ft chain link double swing gate to match existing height. Set new 6" gate post, 6ga. 2" mesh chain link infilled, 2" sch-40 round galvanized frame, with heavy duty greaseable hinges. Install (3) rows of barbed wire on top of new gate. Pour new concrete pad for new operators. Installed 2-HDSW24UL gate operators with battery backup. Install in ground safety loops & exit loops, photo eye, LIFTMASTER 1300libs. Mag lock, operators bolted to new concrete pad.
StateAgency · NV, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityTN
Posted
-
Oct 1, 2026
Work includes approx 590 LF 8" PVC gravity sewer main by trenching, backfilling, jack and bore; 575 LF 8" DI gravity sewer main abandonment.
Somerset Raritan Valley Sewerage Authority
Special DistrictNJ
Posted
Sep 14, 2026
Oct 2, 2026
removal and replacement of the existing wastewater treatment plant influent slide gate located within the Authority's Old Pump Station Junction Chamber. The work also includes temporary flow control and bypass operations to facilitate the craft gate replacement.
West Virginia Department of Transportation
State AgencyWV
Posted
Sep 5, 2026
Oct 20, 2026
Structure replacement i-79 exit 155 bridge replacement.
State of Nevada Office of the Military
State AgencyNV
Posted
Sep 3, 2026
Sep 24, 2026
Work consists of modify and retrofit the existing manual sliding entry gate to an automated, access-controlled system, including structural, electrical, and trenching work. Includes installation of a automated gate operator with access control; retrofit the existing metal gate and supports to accomodate gate motor; contruction of concrete pad and bollard protection; connection of electrical and low voltage back to the existing feild maintenance shop building; installation of automatic vehicle detection loops.