Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes traffic control, develop water supply, 25 EA of install pallet shelter buildings, 3 EA of install ultralav shower / toilet facilities, 7 EA of place picnic tables, 5 EA of construct shade structures, 1 EA of install water fountain / bottle filler, electrical and lighting, 180 LF of install 8' tall perimiter fencing, install 8' tall motorized gate (26.5'long), 80 LF of install 42" tall guardrail (at east vehicular entry), install 3' x 6'-8" access door, 85 SF of landscape area, clearing and grubbing, 300 CY of unclassified excavation (raw), 260 CY of export (raw), 30 LF of remove concrete curb, 200 CY of place 6" crushed miscellaneous base (cmb), 200 CY of place 3" asphalt concrete pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Animal Shelter Generator Project.
Posted Date
Nov 27, 2025
Due Date
Dec 15, 2025
Release: Nov 27, 2025
Close: Dec 15, 2025
Animal Shelter Generator Project.
AvailableThe project includes, but, is not limited to the following items: 1. Installation of new bituminous access roads where specified. 2. Installation of new reinforced turf walkways. 3. Installation of new rain gardens where specified.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
The project includes, but, is not limited to the following items: 1. Installation of new bituminous access roads where specified. 2. Installation of new reinforced turf walkways. 3. Installation of new rain gardens where specified.
AvailableProject includes approx. 2,850 square foot, mixed-use, two story building ,2,350 square foot, one story storage building ,ground floor consists of a three-bay vehicle and equipment storage space ,second floor contains a mix of private and open office spaces, kitchenette, bathroom, and janitor closet, site work, utility connections to somerset road, installation of an on-site innovative sanitary system.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Project includes approx. 2,850 square foot, mixed-use, two story building ,2,350 square foot, one story storage building ,ground floor consists of a three-bay vehicle and equipment storage space ,second floor contains a mix of private and open office spaces, kitchenette, bathroom, and janitor closet, site work, utility connections to somerset road, installation of an on-site innovative sanitary system.
Work include site expansion.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work include site expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis