Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include site expansion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes electric vehicle charging facility expansion.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
Close: Dec 16, 2025
The project includes electric vehicle charging facility expansion.
AvailablePremium
Access the largest public sector contact database
The work of this contract generally includes construction of water treatment plant expansion consisting of two deep bed dual media filters, pipe gallery, electrical gear upgrades, underground concrete disinfection contact basin, and associated site piping modifications. These improvements will include excavation, subgrade preparation, and construction of a facility expansion as well as the installation of various site piping, butterfly valves, and associated fittings, electrical gear, filter control panel and associated valves and instrumentation, and associated site electrical work, underground concrete disinfection contact basin, and site restoration and seeding.
Posted Date
Oct 23, 2025
Due Date
Dec 17, 2025
Release: Oct 23, 2025
Close: Dec 17, 2025
The work of this contract generally includes construction of water treatment plant expansion consisting of two deep bed dual media filters, pipe gallery, electrical gear upgrades, underground concrete disinfection contact basin, and associated site piping modifications. These improvements will include excavation, subgrade preparation, and construction of a facility expansion as well as the installation of various site piping, butterfly valves, and associated fittings, electrical gear, filter control panel and associated valves and instrumentation, and associated site electrical work, underground concrete disinfection contact basin, and site restoration and seeding.
AvailableThe Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
AvailableFrench Creek Elementary School Site Improvements Project.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
French Creek Elementary School Site Improvements Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis