Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Nantucket Islands Land Bank
The work to be performed includes, but is not limited to: earthwork, off island disposal of soil, wetland restoration, water quality and drainage improvements, park improvements, planting, invasive species management and all associated work.
Posted Date
Jun 24, 2026
Due Date
Jul 22, 2026
Release: Jun 24, 2026
Nantucket Islands Land Bank
Close: Jul 22, 2026
The work to be performed includes, but is not limited to: earthwork, off island disposal of soil, wetland restoration, water quality and drainage improvements, park improvements, planting, invasive species management and all associated work.
AvailableNantucket Islands Land Bank
Work consists of providing the labor, materials, equipment and services required to implement a targeted invasive species management and control program. Items include - Japanese knotweed (Reynoutria japonica); Bamboo; Weeping lovegrass (Eragrostis curvula); Phragmites (Phragmites australis); see attached file.
Posted Date
Mar 25, 2026
Due Date
Apr 22, 2026
Release: Mar 25, 2026
Nantucket Islands Land Bank
Close: Apr 22, 2026
Work consists of providing the labor, materials, equipment and services required to implement a targeted invasive species management and control program. Items include - Japanese knotweed (Reynoutria japonica); Bamboo; Weeping lovegrass (Eragrostis curvula); Phragmites (Phragmites australis); see attached file.
Nantucket Islands Land Bank
The partial demolition of existing structures. This includes exterior decks, balconies, porches, stairs and associated railings, interior construction at building 2 unit 2 as indicated on drawings, and all foundations for structures scheduled to be moved. The relocation of existing structures. Structures are to be located on temporary cribbing for future relocation onto permanent foundations. Provide site clearing as indicated on drawings at each site location to accommodate the relocated structures.
Posted Date
Feb 18, 2026
Due Date
Mar 18, 2026
Release: Feb 18, 2026
Nantucket Islands Land Bank
Close: Mar 18, 2026
The partial demolition of existing structures. This includes exterior decks, balconies, porches, stairs and associated railings, interior construction at building 2 unit 2 as indicated on drawings, and all foundations for structures scheduled to be moved. The relocation of existing structures. Structures are to be located on temporary cribbing for future relocation onto permanent foundations. Provide site clearing as indicated on drawings at each site location to accommodate the relocated structures.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge