Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Portland
The project includes, but, is not limited to the following items: 1. Installation of new bituminous access roads where specified. 2. Installation of new reinforced turf walkways. 3. Installation of new rain gardens where specified.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Marblehead
Project consists of waterside cemetery expansion. See attached file.
Posted Date
Nov 20, 2025
Due Date
Dec 10, 2025
Release: Nov 20, 2025
Town of Marblehead
Close: Dec 10, 2025
Project consists of waterside cemetery expansion. See attached file.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Cemetery Admin (36C786)
Provide construction services for national cemetery for a gravesite expansion project.
Posted Date
Dec 2, 2025
Due Date
Dec 12, 2025
Release: Dec 2, 2025
National Cemetery Admin (36C786)
Close: Dec 12, 2025
Provide construction services for national cemetery for a gravesite expansion project.
AvailableClackamas County
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Clackamas County
Close: Jan 29, 2026
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
AvailableClackamas County
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Clackamas County
Close: Jan 29, 2026
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →