Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Post-Filter GAC Adsorption Facilities for P.O. Hoffer Water Treatment Facility and Glenville Lake Water Treatment Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
The Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
AvailableConstruct a GAC Facility to include twelve (12) post-filter GAC contactors, a filter gallery, an electrical room, an intermediate pump station with four (4) vertical turbines can pump, and a backwash pump station with three (3) vertical turbine can pumps. Install yard piping and make connections to existing structures to provide a fully functional post-filter GAC system. Complete building, electrical, instrumentation, and control systems upgrades associated with this work. Start-up and commission all new facilities and associated equipment.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Construct a GAC Facility to include twelve (12) post-filter GAC contactors, a filter gallery, an electrical room, an intermediate pump station with four (4) vertical turbines can pump, and a backwash pump station with three (3) vertical turbine can pumps. Install yard piping and make connections to existing structures to provide a fully functional post-filter GAC system. Complete building, electrical, instrumentation, and control systems upgrades associated with this work. Start-up and commission all new facilities and associated equipment.
AvailableProvide construction services for well no. 3 at water treatment facility #2.
Posted Date
Dec 29, 2025
Due Date
Jan 30, 2026
Release: Dec 29, 2025
Close: Jan 30, 2026
Provide construction services for well no. 3 at water treatment facility #2.
AvailableProvide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
Posted Date
Dec 25, 2025
Due Date
Jan 23, 2026
Release: Dec 25, 2025
Close: Jan 23, 2026
Provide CMAR for retrofitting the filters at a 28.8 MGD water treatment plant, preconstruction services including design constructability reviews and procurement services. Scope of work includes filter underdrain removal and replacement, removing and patching cast-in-place and grout in filter tanks, filter media removal and disposal, filter GAC media replacement, pipe modifications to facilitate media removal and replacement, non-potable water line for a new yard hydrant located outside the facility, and retrofitting filters to maintain continuity of plant operations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →