Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a GAC Facility to include twelve (12) post-filter GAC contactors, a filter gallery, an electrical room, an intermediate pump station with four (4) vertical turbines can pump, and a backwash pump station with three (3) vertical turbine can pumps. Install yard piping and make connections to existing structures to provide a fully functional post-filter GAC system. Complete building, electrical, instrumentation, and control systems upgrades associated with this work. Start-up and commission all new facilities and associated equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
The Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis
The Fayetteville Public Works Commission (Fayetteville PWC) is soliciting construction of post-filter granular activated carbon (GAC) adsorption facilities at the P.O. Hoffer and Glenville Lake water treatment facilities in Fayetteville, NC. Work includes construction of multiple post-filter GAC contactors, filter galleries, electrical buildings, pump stations, yard piping connections, upgrades to building/electrical/instrumentation/control systems, and startup/commissioning. The posting lists a period of performance scheduled to be completed by November 2025 and an estimated range value of $20,000,000 - $40,000,000.
AvailableProject consists water treatment facility upgrade. See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 1, 2026
Release: Dec 3, 2025
Close: Jan 1, 2026
Project consists water treatment facility upgrade. See outside link.
AvailableUpgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailableWork consist of construction of a new single story 6,600 SF water treatment facility, including office and laboratory testing area. Structure consists of precast concrete T roof supported by insulated precast wall panels on cast-in-place concrete foundation. Interior partitions of CMU and GWB on metal studs. Roofing is EPDM on continuous insulation. Electrical, plumbing and HVAC systems are included. See outside link.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work consist of construction of a new single story 6,600 SF water treatment facility, including office and laboratory testing area. Structure consists of precast concrete T roof supported by insulated precast wall panels on cast-in-place concrete foundation. Interior partitions of CMU and GWB on metal studs. Roofing is EPDM on continuous insulation. Electrical, plumbing and HVAC systems are included. See outside link.