Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide qualified engineering companies to serve as an owner's advisor for upcoming design and subsequent construction projects related to the water treatment plant (wtp) expansion and associated infrastructure; associated infrastructure includes new water transmission mains to improve overall system hydraulics from the expanded wtp to the distribution system. Design and construction of the wtp expansion and the water transmission main(s) are planned to occur concurrently, the purpose of this document is to solicit qualifications of engineering firms (firm) interested in providing owner s advisor professional services during procurement and through construction/warranty phases of all infrastructures associated with the wtp expansion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
For A/S infrastructure and streetscape improvements.
Posted Date
Jan 18, 2026
Due Date
Jan 26, 2026
Release: Jan 18, 2026
Close: Jan 26, 2026
For A/S infrastructure and streetscape improvements.
The Wyoming State Construction Department is soliciting Statements of Qualifications from professional service providers across disciplines such as architecture, engineering, surveying, geotechnical, environmental, and related services. Approved statements may be kept on file for two years and multiple firms may be selected for future projects. This is a standing qualifications roster solicitation and is not a grant program, and it remains open through December 31, 2026.
Posted Date
Jan 2, 2026
Due Date
Dec 31, 2026
Release: Jan 2, 2026
Close: Dec 31, 2026
The Wyoming State Construction Department is soliciting Statements of Qualifications from professional service providers across disciplines such as architecture, engineering, surveying, geotechnical, environmental, and related services. Approved statements may be kept on file for two years and multiple firms may be selected for future projects. This is a standing qualifications roster solicitation and is not a grant program, and it remains open through December 31, 2026.
AvailableBPL Network Backbone Bandwidth Expansion (10gb/s).
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
BPL Network Backbone Bandwidth Expansion (10gb/s).
AvailableConstruction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis