Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes maintenance of traffic 1 ls, steel mast arm assembly, f&I, 40' single 2 ea, steel mast arm assembly, f&I, 50' single 2 ea, rect rapid flash beacon (RRFB), F&I solar complete assy sgl DIR 20 as, single column ground sign assembly, F&I grnd mount, less than 12 sf, single column ground sign assembly, F&I grnd mount 12-20 sf 1 ea, single column ground sign assembly, relocate 5 ea, single column ground sign assembly, remove 32 ea, sign panel, F& I overhead mount, up to 12 sf 9 ea, object marker, type 1, 18"+ diamond 1 ea, thermoplastic, standard, white, message or symbol 3 ea, thermoplastic, standard, white arrow 9 ea, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Arterial street rehabilitation - Pine Street and Martin Luther King Boulevard intersection. Bid items: 304 CY unclassified excavation; 1,232 SY solid slab sodding; 8,758 SY cold mill pavement; 927 SY of 4" conc sidewalk; 25 SY of 4" decorative conc sidewalk; 8 hour traffic signal maintenance. See attached file.
Posted Date
Dec 26, 2025
Due Date
Jan 30, 2026
Release: Dec 26, 2025
Close: Jan 30, 2026
Arterial street rehabilitation - Pine Street and Martin Luther King Boulevard intersection. Bid items: 304 CY unclassified excavation; 1,232 SY solid slab sodding; 8,758 SY cold mill pavement; 927 SY of 4" conc sidewalk; 25 SY of 4" decorative conc sidewalk; 8 hour traffic signal maintenance. See attached file.
AvailableProvide parkway improvements, phase III. The project includes but is not limited to new construction of approx. 2000 LF of road- way improvements and associated infrastructure.
Posted Date
Nov 19, 2025
Due Date
Mar 10, 2026
Release: Nov 19, 2025
Close: Mar 10, 2026
Provide parkway improvements, phase III. The project includes but is not limited to new construction of approx. 2000 LF of road- way improvements and associated infrastructure.
AvailableThe improvements will include: - install a new raised, two-way cycle track on Martin Luther King jr. Way between 2nd street and 14th street to provide a safe and comfortable bike route for all ages. This cycle track will connect with several other existing and planned bike facilities connecting. Install curb ramps and bulb-outs to improve pedestrian safety and accessibility for people with disabilities. - install high-visibility crosswalk markings and pedestrian lighting t o increase visibility for pedestrians in crosswalks and improve pedestrian safety, particularly for pedestrians crossing under i-880. - plant new street trees to make the city more climate resilient by regulating extreme temperatures, sequestering carbon, and mitigating air pollution in the area. - install fiber optic cable between embarcadero west and 7th street to enable the expansion of oak wifi, a program that provides free internet to oaklanders to help close the digital divide, and to improve traffic signal coordination along the corridor. - new traffic signal mast arms, protected left turns, bike signals, and pedestrian countdown heads to increase traffic safety.
Posted Date
Dec 26, 2025
Due Date
Feb 5, 2026
Release: Dec 26, 2025
Work includes new road construction and intersection improvements.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
Work includes new road construction and intersection improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 5, 2026
The improvements will include: - install a new raised, two-way cycle track on Martin Luther King jr. Way between 2nd street and 14th street to provide a safe and comfortable bike route for all ages. This cycle track will connect with several other existing and planned bike facilities connecting. Install curb ramps and bulb-outs to improve pedestrian safety and accessibility for people with disabilities. - install high-visibility crosswalk markings and pedestrian lighting t o increase visibility for pedestrians in crosswalks and improve pedestrian safety, particularly for pedestrians crossing under i-880. - plant new street trees to make the city more climate resilient by regulating extreme temperatures, sequestering carbon, and mitigating air pollution in the area. - install fiber optic cable between embarcadero west and 7th street to enable the expansion of oak wifi, a program that provides free internet to oaklanders to help close the digital divide, and to improve traffic signal coordination along the corridor. - new traffic signal mast arms, protected left turns, bike signals, and pedestrian countdown heads to increase traffic safety.
Available