Stormwater On Call Contractor RFP
Work includes removal of rigid pavement; removal of concrete curb; removal of existing storm pipe; removal of existing storm structure; removal of vegetation; replace 12" storm pipe with concrete pipe; replace 18" storm pipe with concrete pipe; replace 24" storm pipe with concrete pipe; replace 27" storm pipe with concrete pipe; replace 30" storm pipe with concrete pipe; replace 36" storm pipe with concrete pipe; replace 54" storm pipe with concrete pipe; replace 60" storm pipe with concrete pipe; replace 66" storm pipe with concrete pipe. See attached file.