Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lee County Electric Cooperative is soliciting proposals to design and construct oil well caisson foundations. The solicitation (RFP-2026-01-2070-0-2026/EO) was posted 2026-01-12 and is due 2026-02-06 at 12:00 PM Eastern. Bid documents are available for download on the posting and the contact listed is Emmett Orfan (Emmett.Orfan@lcec.net).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 3, 2025
Close: Jan 27, 2026
Construction of the oil well road.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Posted Date
-
Due Date
Feb 10, 2026
The Ohio Department of Natural Resources, Division of Oil & Gas Resources Management seeks bids from prequalified contractors to plug and restore one orphan well in Columbiana County (Yellow Creek Township) under the Orphan Well Program. The contract includes mobilization, drilling or cleanout, plugging, equipment removal, material disposal, and full site restoration. A mandatory site visit/pre‑bid meeting is required before the submission deadline.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
The Ohio Department of Natural Resources, Division of Oil & Gas Resources Management seeks bids from prequalified contractors to plug and restore one orphan well in Columbiana County (Yellow Creek Township) under the Orphan Well Program. The contract includes mobilization, drilling or cleanout, plugging, equipment removal, material disposal, and full site restoration. A mandatory site visit/pre‑bid meeting is required before the submission deadline.
Construction of Oil Well Road (C.R.858) Shoulder Improvement Segments 3 & 4 Project.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Construction of Oil Well Road (C.R.858) Shoulder Improvement Segments 3 & 4 Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Close: Feb 10, 2026
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Available