Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP seeks proposals for the Well 1 Upgrades project for the Town of Shelburne, encompassing watermain and diesel generator installation, UV disinfection unit replacement, structural modifications, water quality equipment, electrical/SCADA upgrades, and site improvements.
Posted Date
Dec 1, 2025
Due Date
Jan 29, 2026
Release: Dec 1, 2025
Close: Jan 29, 2026
This RFP seeks proposals for the Well 1 Upgrades project for the Town of Shelburne, encompassing watermain and diesel generator installation, UV disinfection unit replacement, structural modifications, water quality equipment, electrical/SCADA upgrades, and site improvements.
AvailableThe Township of Stafford (NJ) is soliciting bids to decommission Wells 1 & 2 and perform upgrades to Well No. 12, with work to be conducted at the Township well sites. All solicitation documents (Notice to Bidders, Instructions to Bidders, Technical Specifications, Bid Plans, and required compliance forms) are posted on Stafford Township's Bonfire opportunity and submissions are made via the Bonfire portal. This is an open RFB (not a grant), posted 2026-01-08 and closing 2026-01-27; a voluntary pre-bid meeting is scheduled for 2026-01-14 and questions are due 2026-01-22.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
The Township of Stafford (NJ) is soliciting bids to decommission Wells 1 & 2 and perform upgrades to Well No. 12, with work to be conducted at the Township well sites. All solicitation documents (Notice to Bidders, Instructions to Bidders, Technical Specifications, Bid Plans, and required compliance forms) are posted on Stafford Township's Bonfire opportunity and submissions are made via the Bonfire portal. This is an open RFB (not a grant), posted 2026-01-08 and closing 2026-01-27; a voluntary pre-bid meeting is scheduled for 2026-01-14 and questions are due 2026-01-22.
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Available