CityMD
Jul 14, 2026
Closes
Aug 11, 2026
Signal Reconstruction Frederick St. at E. Memorial Blvd
Work includes 200 LF temporary orange fence; 3 CY utility relocation; 30 SF removal concrete pavement; 3 CY test pit; 2 ct concrete for misc construction 3 SY method "f" bituminous repair; 30 SF concrete sidewalk; 2 CY furnish place topsoil; 3 CY concrete signal foundation; 20 LF 2" sch 80 pvc trenched; 2 EA ground rods 3/4" x 10'; 1 EA traffic signal divided hand box; 200 LF 3/8" galvanized steel span wire; 200 LF 1/4" galvanized tether wire. See attached file.