Northwest Harris County Mud 5
The project includes demolition and removal of Ground Storage Tank No. 1, above-ground water well discharge piping, booster pump station piping and foundation, generator pad, and fuel tank with foundation. The existing booster pumps and motors will be refurbished, including replacement of seals with mechanical seals. Furnish and install new 426,500-gallon welded steel ground storage tank with cathodic protection, along with new water well discharge piping, booster pump station piping and foundation pad, and a diesel-powered emergency generator. Hydropneumatic Tanks No. 1 (10,000 gallon) and No. 2 (15,000 gallon) will be rehabilitated by power washing, abrasive blasting, and recoating of both interior and exterior surfaces. The project also includes site preparation, grading, drainage, yard piping, and all components to ensure the smooth operation of the water plant.
Town of Taylorsville
Work includes water treatment plant rehabilitation.
Northwest Harris County Mud 5
Provide lift station no. 5, 6, and 11 generator additions. Scope of project to include but not limited to: three (3) natural gas generator additions including foundations, sound attenuating enclosures, load banks, duct banks, ATS, existing pavement saw cut and disposal, and all necessary electrical components and all appurtenances for a complete emergency natural gas generator electrical power system addition for the three (3) different existing lift stations, in accordance with plans and specifications. Site restoration. All work shall be complete in place.
City and County of San Francisco
Provide water pollution control plant, secondary clarifiers rehabilitation. Separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities.
Release
-
Close
Nov 06, 2025