North 3 Utilities Extension Project (UEP) Contract 7 - Area 908, 912 & 918
Work includes 258 EA silt barriers across swales, 86 LF silt fence along species, 293 EA inlet protection, 73 EA silt curtain in canal, 2,652 SY remove & replace plain concrete driveway (residential), 880 LF 8" future driveway casing for 4" mains, 1,080 LF 12" future driveway casing for 6" mains, 330 SY new concrete sidewalk, alt 5, 71,694 SY remove and replace asphalt (local roads), 6,150 SY milling - typical roadway, 86 ton leveling course-typical roadway, 7,287 LF median curb and gutter, 648 SY alt 5 4" concrete driveway replacement/extension. See attached file.