Posted
Aug 26, 2026
Sep 18, 2026
W912QR26QA094 - Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin
Work includes approx. of repair of the drainage ditch at the lake.
Description: Tailwater restroom construction. The contractors work and responsibility will include all planning, programming, measurements and estimates of quantities, administration, supervision, communications, and inspection necessary to ensure that all work is conducted in accordance with the contract requirements and all applicable federal, state, and local laws and regulations. See attached file.
Federal · KY, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Posted
Aug 26, 2026
Sep 18, 2026
Work includes approx. of repair of the drainage ditch at the lake.
CityMI
Posted
Sep 11, 2026
Oct 30, 2026
The City of Pontiac, through its Housing Vitality Division, is seeking qualified contractors or design-build teams to design and construct new public restroom facilities at Aaron Perry Park, Jaycee Park, and Oakland Park. The work includes site review, utility coordination, construction of durable ADA-compliant facilities, lighting, ventilation, security features, and close-out documentation. The solicitation is for a three-year contract with two one-year renewal options, funded as CDBG-eligible work, and proposals are evaluated on technical qualifications and price.
CityMI
Posted
Sep 11, 2026
Oct 30, 2026
The City of Pontiac, through its Housing Vitality Division, is seeking qualified contractors or design-build teams to design and construct new public restroom facilities at Aaron Perry Park, Jaycee Park, and Oakland Park. The work includes site review, utility coordination, construction of durable ADA-compliant facilities, lighting, ventilation, security features, and close-out documentation. The solicitation is for a three-year contract with two one-year renewal options, funded as CDBG-eligible work, and proposals are evaluated on technical qualifications and price.
CityKY
Posted
Jul 10, 2026
Sep 18, 2026
Reconstruction of river road to a 4-lane facility. This project includes new sidewalks, a new multi-use path, and a new light. 20 LF of standard curb and gutter modifications; 19,081LF of standard integral curb; 2,018 LF of 6' chain link fence; 179 Ton asphalt pavement milling and texturing; 3,055 SY of 4" concrete sidewalk; 2 EA 4" PVC pipe; 2,706 SY of erosion control blanket; pavement markings; 1,199 LF of sawcut pavement; 60 EA bollards; 4,981 LF of 15" storm sewer pipe; 1,557 LF of 18" storm sewer pipe; 7 EA bypass manhole; 4,641 LF of trenching and back filling; 60 LF of waterline encasement steel bored ranges; 6 EA fire hydrant assembly; 4,200 LF of 12" ductile iron waterline pipe; 60 LF of 24" welded steel waterline casing pipe. See attached files.
Decision makers connected to this RFP from U.S. Army Engineer District Louisville.